How are container houses delivered globally?

From the factory to the construction site

Container houses are now widely used in various scenarios such as construction site dormitories, emergency resettlement, offices and residences.
The question that many customers are concerned about is: How are these houses delivered?
Generally, depending on the room type and transportation distance, there are mainly two delivery methods:
Disassembly and module transportation (flat packaging)
Complete transportation (full container delivery)
Both methods can ensure the safety, efficiency and cost optimization of the transportation process

Flat-pack packaging method

The flat-pack container houses have been pre-assembled before leaving the factory and can be disassembled into components such as the roof, floor, walls, and frame.
When these components are packed together, they can significantly reduce the transportation volume, making them particularly suitable for international exports or long-distance projects.
Advantages:
Save space: One 40HQ container can hold more than 15 sets of houses.
Save freight costs: International transportation costs are lower.
Stable packaging: Reduces the risk of damage during transportation.
Delivery process:
Factory prefabricates each structural component
Plates are packed and sealed with waterproof film
Loaded into containers and fixed
Shipped by sea or land to the destination The site was assembled by the installation team (completed in 4 to 6 hours)

container home sea shipping

Overall transportation method

For types such as expandable container houses, foldable prefabricated houses, and office container houses, the overall transportation method is adopted
This approach ensures the integrity of the house structure and allows it to be used upon arrival at the site.
Feature : Transported directly by trucks or flatbed trailers
After arriving at the site, it can be used simply by connecting water, electricity and drainage systems Perfectly suitable for emergency shelters, mobile offices and display spaces

Fast, safe and reliable delivery method

The flat-pack assembly room is lifted by cranes, connected with bolts, and installed with seals
The entire house only requires positioning and connecting the water and electricity
Usually, an installation team of 3 to 5 people can complete the assembly and preparation for occupancy within one day

Whether you choose palletized packaging for transportation or the overall delivery method,
we can develop the most optimal transportation and installation plan based on the project requirements, ensuring that the house arrives safely and is ready for use promptly